GPIL New Layout
Get in touch
Godawari integrated steel plant at sunset, with green belt and hills behind

Powering newhorizons.

One Godawari: an integrated group from mine to wire to battery, building India’s industrial and clean-energy future.

Explore New Energy

A 40 GWh battery storage plant, coming up in Maharashtra.

Solar panels at sunset

Since 1999 Godawari has grown from one steel plant in Raipur into one of India’s most integrated industrial groups. Captive mines, pellets, sponge iron, billets, wire and our own power now sit under one name, and the same wing is carrying us into solar and battery storage.

01
Open-cast iron ore mine

Captive Ore

Ari Dongri and Boria Tibu supply most of our iron ore, with about 165 MnT of reserves and 35+ years of mine life.

02
Kiln with glowing charge

Pellets to Sponge Iron

Siltara’s integrated plant turns ore into 2.7 MTPA of high-grade pellets and 650,000 MTPA of sponge iron.

03
Steel transmission tower

Wire and Structures

Billets become wire rods, HB wire and galvanised structures for India’s roads, grids and buildings.

04
Solar farm at sunset

Clean Power, Stored

236 MW of captive power today, 290 MW of solar on the way and a 40 GWh battery plant in Maharashtra.

Integrated value chain

Mine to Wire, Under One Roof.

Captive mines feed the Siltara integrated plant, where ore becomes pellets, sponge iron, billets and wire, powered by the group’s own plants. Scroll, or select a stage, to see its capacity.

3.05MnT / yr

Captive iron ore mines

Why Godawari

Godawari engineer in a branded white helmet, red wing behind him

Captive mines, 35+ year reserve life

Two iron ore mines secure most of the ore our plants use.

Integrated at Siltara

Beneficiation, pellets, sponge iron and billets on one site.

Our own power

236 MW captive, from solar, waste heat and thermal.

Built in India since 1999

Rooted in Chhattisgarh, now growing in Maharashtra.

One Godawari

One Godawari is not about making every business the same. It is about making every business work towards the same ambition.

The business has done the hard work: technical, reliable and operationally strong. Now the brand matches the ambition.

Accelerate tomorrow. From an inward-facing technical company to an outward-facing national brand of progress.

Brand transformationGodawari group, 2026Read our story

From steel to sustainability
The next horizon runs on clean power. We are moving our own plants to solar and building battery storage for the grid. The steel side stays efficient; the new energy side helps India store the power it makes.

290MW
Captive solar165 MW in operation, with 125 MW more on acquired land for the pellet plant, beneficiation and steel expansion.
40GWh
Battery storage plantGodawari New Energy’s BESS facility in Maharashtra: 20 GWh in FY27, 40 GWh by FY29.
66%+ Fe
High-grade pelletsBeneficiation lifts ore grade, so the kilns use less energy per tonne of iron.

Latest News

What is moving across our plants, our power and our new energy business.